Migrate Torrust Tracker Demo from Digital Ocean to Hetzner #3

@josecelano

Description

@josecelano

We decided to change hosting providers due to cost and performance.

Summary

This epic tracks the complete migration of the Torrust Tracker demo from its current environment to a new virtual machine hosted on Hetzner. The goals are:


Torrust Tracker Demo Migration Plan - Digital Ocean to Hetzner

UPDATED ON: 2025-08-07

Overview

This plan outlines the migration of the Torrust Tracker demo from Digital Ocean to Hetzner
infrastructure. The migration prioritizes ease of updates over performance by maintaining
Docker-based deployments, and follows a complete local development and testing approach
before deploying to production.

Key Decisions

  • Docker-first approach: Continue using Docker for the tracker to simplify updates
    (just pull new images)
  • Complete local testing: Finish all development and testing locally before creating
    any Hetzner VMs
  • MySQL by default: Replace SQLite with MySQL for better production characteristics
  • 12-Factor App compliance: Refactor the entire repository to follow modern deployment
    practices

Migration Phases

Phase 1: Database Migration to MySQL

Objective: Replace SQLite with MySQL as the default database

Tasks

  • Add MySQL service to docker-compose.yaml
  • Update tracker configuration (tracker.toml) to use MySQL connection
  • Create MySQL initialization scripts/schema
  • Update environment variable templates (.env.production)
  • Update documentation for MySQL setup

Validation

  • Deploy locally using make apply
  • Verify MySQL service starts successfully
  • Make test announce request
  • Confirm download counter increases in MySQL torrents table
  • Test tracker restart with persistent MySQL data

Deliverable: Working local deployment with MySQL backend


Phase 2: 12-Factor App Refactoring

Objective: Refactor repository to follow 12-Factor App methodology

Reference: See detailed plan in infrastructure/docs/refactoring/twelve-factor-refactor/

Key Changes

  • Configuration via environment: Move all config to environment variables
  • Dependency isolation: Explicit dependency declaration in Docker
  • Stateless processes: Ensure tracker processes are stateless
  • Port binding: Clean service port configuration
  • Logs as streams: Structured logging to stdout/stderr
  • Environment parity: Dev/staging/prod environment consistency

Tasks

  • Implement configuration refactoring (see phase-1-implementation.md)
  • Update Docker configurations
  • Refactor environment variable management
  • Update deployment scripts
  • Update documentation

Deliverable: 12-Factor compliant repository structure


Phase 3: Complete Application Installation Automation

Objective: Fully automate tracker deployment including SSL certificates

Current State

  • ✅ VM provisioning via cloud-init
  • ✅ Basic app setup (copy files, .env config, docker compose up)
  • ❌ SSL certificate generation
  • ❌ Crontab setup for renewals
  • ❌ Production hardening steps

Tasks

  • Automate SSL certificate generation with Certbot
  • Set up automatic certificate renewal crontabs
  • Implement production hardening automation
  • Create comprehensive deployment validation script
  • Handle edge cases and error recovery

Implementation Notes

Deliverable: One-command deployment to production-ready state


Phase 4: Hetzner Infrastructure Implementation

Objective: Add Hetzner Cloud provider support and validate complete deployment

Tasks

  • Research and add Hetzner Cloud OpenTofu provider
  • Create Hetzner-specific Terraform configurations
  • Implement Hetzner cloud-init adaptations
  • Test complete deployment pipeline on Hetzner
  • Configure provider-level firewall (optional, complementing VM firewall)
  • Validate tracker accessibility via IP (HTTP)

Provider Firewall Consideration

  • VM firewall via cloud-init: ✅ Required
  • Provider firewall: 🤔 Optional additional security layer

Validation

  • Deploy test VM on Hetzner
  • Verify all services start correctly
  • Test tracker functionality (announce, scrape)
  • Confirm firewall rules work correctly
  • Performance and connectivity testing

Deliverable: Working Hetzner deployment with IP access


Phase 5: Database Migration (Optional)

Objective: Migrate existing tracker data from Digital Ocean SQLite to Hetzner MySQL

Tasks

  • Export existing SQLite data from Digital Ocean instance
  • Create data transformation scripts (SQLite → MySQL)
  • Import data to new MySQL instance
  • Validate data integrity and completeness
  • Test tracker with migrated data

Note: This step is optional and can be skipped for a fresh start


Phase 6: Grafana Configuration

Objective: Manually configure Grafana for monitoring the tracker.

Tasks

  • Log in to Grafana at http://localhost:3100/ with default credentials (admin/admin).
  • Change the default admin password.
  • Configure the Prometheus data source to poll the tracker's API metrics endpoint.
  • Optional: Import pre-built dashboards from the repository to visualize tracker metrics.

Note: An issue will be opened with more details when work on this phase begins.

Deliverable: A configured Grafana instance with a Prometheus data source and dashboards.


Phase 7: Testing and Validation

Objective: Comprehensive testing of the new Hetzner deployment

Testing Areas

  • Functional Testing: All tracker endpoints work correctly
  • Performance Testing: Announce/scrape response times
  • Integration Testing: Index ↔ Tracker communication
  • Monitoring: Grafana dashboards show correct metrics
  • SSL Testing: HTTPS certificate generation and renewal
  • Backup Testing: Database backup and restore procedures

Test Scenarios

  • Fresh torrent announce and scrape
  • High-load announce testing
  • Tracker restart with data persistence
  • Certificate renewal simulation
  • Firewall rule validation

Deliverable: Fully validated production deployment


Phase 8: Go Live

Objective: Switch production traffic to Hetzner infrastructure

Pre-Go-Live

  • Consider static IP allocation on Hetzner
  • Prepare DNS change procedures
  • Document rollback plan

Go-Live Steps

  • Update DNS records to point to new Hetzner IP
  • Update Digital Ocean index configuration:
    • Change tracker resolution from Docker service name to public domain
    • Index will access tracker via public API instead of internal Docker network
  • Monitor traffic and error rates
  • Validate end-to-end functionality

Post-Go-Live

  • Monitor system stability for 24-48 hours
  • Verify certificate auto-renewal works
  • Confirm backup procedures
  • Update documentation with new procedures

Deliverable: Production traffic on Hetzner infrastructure


Future Considerations

Dynamic Configuration (Future Work)

Currently hardcoded in cloud-init:

  • Number of tracker instances (e.g., 2 UDP trackers on ports 6868, 6969)
  • Firewall port configurations
  • Service scaling parameters

Future Enhancement: Inject dynamic configuration via template variables

Repository Template Usage

This repository serves as a template for users deploying their own trackers. Current
hardcoded configurations can be manually adapted, but future work could make this more
dynamic.

Risk Mitigation

Rollback Plan

  • Keep Digital Ocean instance running until Hetzner deployment is fully validated
  • Maintain DNS rollback capability
  • Document emergency procedures

Testing Strategy

  • All changes tested locally before Hetzner deployment
  • Staged rollout with validation at each phase
  • Comprehensive testing before DNS switch

Success Criteria

  • Tracker accessible via HTTPS on Hetzner
  • MySQL database working with persistent data
  • Grafana monitoring functional
  • SSL certificates auto-renewing
  • Index successfully communicating with tracker
  • Performance equivalent to or better than Digital Ocean
  • 12-Factor App compliance achieved
  • One-command deployment working

Sub-issues

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions