-
Notifications
You must be signed in to change notification settings - Fork 2
Description
After an IBEX restart one of the Vesuvio forward foils failed to work.
From the scientist:
The issue seems to be resolved right now. It required me coming to the lab, power-cycling the Mclennan crate, manually setting the U and L limits on the Mclennan panel, and finally setting the hi and lo limits as well as testing the homing of the forward left and right foils in IBEX. On the whole, my impression is that, for some reason, contrary to the forward right foil, the forward left foil is misbehaving after an IBEX restart or at the beginning of almost each cycle. It took us nearly 3 hours tonight to see what was happening, then I came at ca 10 am and it took me another hour or so to get to the stage at which I could resume running. Taken together, VESUVIO has just lost ca 12 hours worth of beamtime due to these issues.
Acceptance Criteria:
- Axis homes reliably & correctly in IBEX
- There is a system test for this
- Special homing sequence is remove from the wiki
- Instrument scientists told