-
Notifications
You must be signed in to change notification settings - Fork 0
New Interface Planning
cpviolator edited this page Aug 22, 2024
·
1 revision
What do we need from the new interface?
- Ability to specify residuals per pole for the multi-shift solver.
- Use a different operator for subsequent polishing than was used for the initial solver (for HISQ).
- Solvers should return not only solution vectors, but a measure of their accuracy (the norms of the residual vectors, for example).